This project was an engineered repair of an existing elevated driveway, which included some new framing, all new concrete driveway, new guardrails and stair structure.
Finished Site Condition – Stair Structure Complete On Elevated Driveway:
![stair structure complete on elevated driveway 700x400](https://hytechconstruction.com/wp-content/uploads/2023/07/stair-structure-complete-on-elevated-driveway-700x400-1.jpg)
Finished Site Condition – Engineered Structural Repair In San Carlos:
![Engineered structural repair in San Carlosm finished site image rotated 700x400](https://hytechconstruction.com/wp-content/uploads/2023/07/Engineered-structural-repair-in-San-Carlosm-finished-site-image-rotated-700x400-1.jpeg)
Pre-site Condition:
During Construction – Framing For Stair Structure On Elevated Driveway:
![Copy of Sive FB post framing for stair structure on elevated driveway scaled 700x400](https://hytechconstruction.com/wp-content/uploads/2023/07/Copy-of-Sive-FB-post-framing-for-stair-structure-on-elevated-driveway-scaled-700x400-1.jpg)
New Framing Installed To Repair Elevated Driveway:
![Copy of Sive FB post new framing installed to repair elevated driveway scaled 700x400](https://hytechconstruction.com/wp-content/uploads/2023/07/Copy-of-Sive-FB-post-new-framing-installed-to-repair-elevated-driveway-scaled-700x400-1.jpg)
Moisture Barrier Installed In Preparation For New Concrete Driveway On Elevated Driveway
![Copy of Sive FB post moisture barrier installed in preparation for new concrete driveway on elevated driveway scaled 700x400](https://hytechconstruction.com/wp-content/uploads/2023/07/Copy-of-Sive-FB-post-moisture-barrier-installed-in-preparation-for-new-concrete-driveway-on-elevated-driveway-scaled-700x400-1.jpg)