The construction job involved a critical structural pier and mat slab mitigation project situated at the edge of a creek. The goal was to strengthen the existing foundation and protect it from potential erosion and water damage. The construction team implemented specialized techniques and materials to ensure the stability and longevity of the structure, safeguarding it from the environmental challenges posed by the nearby creek.

Completed Project:


Pre-site Conditions


Delivery of Dirt Box


Drilling:


Installation Crane:


Pier Cage Installed:

Similar Posts