COMPLETED PROJECTSKeystone Block Wall in Redwood CityPre-site Conditions: Footing compacted, the first row of Keystone Blocks in place, filter fabric installed and drain pipes installed: A second level of Keystone Blocks in Place: Installing the Second level of Keystone Blocks: Drilling: Finished Site: