Finished Deck:


Finished Landscape with Drains:


Pre-site Conditions:


Demolishing and Grubbing:


False Steel “I” Beam Wall And Temporary Road Construction:


Drilling Pier Holes And Removing Spoils:


Forming Walls & Installing Reinforcing Steel:


Pouring Concrete Into The Drilled Holes With Cages:


Finished Concrete Lower Wall:


Damaged Drainage Pipes To Be Repaired:


Finished Concrete Walls With Reinforcing Steel Stubbed Out For New Walls To Connect To: