The construction job involved a critical structural pier and mat slab mitigation project situated at the edge of a creek. The goal was to strengthen the existing foundation and protect it from potential erosion and water damage. The construction team implemented specialized techniques and materials to ensure the stability and longevity of the structure, safeguarding it from the environmental challenges posed by the nearby creek.
Similar Posts
Engineered Structural Solution to Extend Existing Deck
Completed Project The engineered structural solution involved the installation of steel support beams and columns to…
Solid Concrete Driveway in Woodside
Finished Site Condition: This was an entirely engineered project that required the involvement of soils and…
Keystone Block Wall in Redwood City
Finished Site Condition: Pre-site Conditions: Footing Compacted, The First Row Of Keystone Blocks In Place, Filter…
Retaining Wall in Hillsborough
Finished Deck: Finished Landscape with Drains: Pre-site Conditions: Demolishing and Grubbing: False Steel “I” Beam Wall…
Steel I Beam Retaining Wall in Belmont
As a result of a failing wooden retaining wall, the owner’s concrete driveway started to crack…
Landslide Repair and Keystone Block Retaining Wall in Daly City
Compacting Base Rock Foundation: