Finished Site:
finished and painted Steel I Beam supports next to failing concrete retaining wall:
![Finished finished and painted Steel I Beam supports next to failing concrete retaining wall scaled 700x400](https://hytechconstruction.com/wp-content/uploads/2023/08/Finished-Jeff-Garratt-2.JPG-finished-and-painted-Steel-I-Beam-supports-next-to-failing-concrete-retaining-wall-scaled-700x400-1.jpg)
Pre-site Conditions Showing Existing Wall in Failure:
During Construction
Drilling:
![Drilling DSC02453 JPG Setting up portable hydraulic drill rig scaled 700x400](https://hytechconstruction.com/wp-content/uploads/2023/08/Drilling-DSC02453.JPG-Setting-up-portable-hydraulic-drill-rig_-scaled-700x400-1.jpg)
As a result of a failing wooden retaining wall, the owner’s concrete driveway started to crack…
Finished Site Condition: Pre-site Conditions and Preparations Demolishing and Grubbing: Drilling: Setting Steel I-Beam Posts in…
Finished Site Condition: HTCI was hired by this owner to build a team of engineers to…
Pre-site Conditions: Preparing for Drilling: Drilling Piers: Setting Steel I Beam Walls – Pier Cages: Building…