As a result of a failing wooden retaining wall, the owner’s concrete driveway started to crack and fail. As the wall continues to fail, cracking and failure became worse.

Finished Site Condition:

Completed Wall:

In order to prepare the project’s site, BMPs were practiced by installing straw wattles, silt fences, and safety cones. Once BMPs were in place, demolition was begun. Demolition involved removing the strip of concrete, excavating behind failing walls and removing walls.

Completed Driveway:


Pre-site Conditions:


Best Management Practices(BMPs) and Demolition:

In order to prepare the project’s site, BMPs were practiced by installing straw wattles, silt fences, and safety cones. Once BMPs were in place, demolition was begun. Demolition involved removing the strip of concrete, excavating behind failing walls and removing walls.


Setting Steel I-Beam Posts:

Installing Drainage System Behind I Beam Retaining Wall 61169389115 7B620433 D3EB 4E77 A446 D00759BB1B9E scaled 500x280

Welding Temporary Guard Rail:

Welding Temporary Safety Guard Rail IMG 4825 scaled 600x400

Compacting Behind Steel I-Beam Wall:


Pouring Concrete Driveway: