Steel I Beam Retaining Wall in Belmont

Pre-site Conditions:

As a result of a failing wooden retaining wall, the owner’s concrete driveway started to crack and fail. As the wall continues to fail, cracking and failure became worse.

In order to prepare the project’s site, BMPs were practiced by installing straw wattles, silt fences, and safety cones. Once BMPs were in place, demolition was begun. Demolition involved removing the strip of concrete, excavating behind failing walls and removing walls.

Best Management Practices(BMPs) and Demolition:

In order to prepare the project’s site, BMPs were practiced by installing straw wattles, silt fences, and safety cones. Once BMPs were in place, demolition was begun. Demolition involved removing the strip of concrete, excavating behind failing walls and removing walls.

Setting Steel I-Beam Posts

Installing Drainage System Behind I-Beam Retaining Wall 61169389115__7B620433-D3EB-4E77-A446-D00759BB1B9E

Welding Temporary Guard Rail

Welding Temporary Safety Guard Rail IMG_4825

Compacting Behind Steel I-Beam Wall

Pouring Concrete Drive Way

finished site condition

Completed Wall

Completed Driveway